PRODUCTS


Reinforcement Anchoring Material
Main business:Building, infrastructure, industrial, mining, marine engineering, military engineering, expressway, tunnel, bridge, concrete repair, installation of large-scale mechanical equipment, wind power equipment, foundation bolt fixing, etc. High-performance, early-strength, micro-expansion, self-compacting, large-flow leveling, rapid repair cement grouting material
- Commodity name: Reinforcement Anchoring Material
- Description
-
Application Scenarios Characteristics: 1. Bridge Construction Engineering 1. High - strength, Fast - setting and Slight Expansion 2. Railway and Rail Transit 2. Self - flowing State and High Bonding Strength 3. Water Conservancy,Hydropower and Port Engineering 3. Anti - freeze - thaw and Corrosion Resistance 4. Special Structures and Components 4. No Chloride Ions and Anti - oxidation 5. Strengthening,Reconstruction and Anti-seepage Engineering Usage Method
Preparatory Work
Before grouting, the surface of the base in contact with the grouting material should be cleaned and roughened. The surface of the base concrete should be fully wetted 24 hours before grouting, and any accumulated water should be removed 1 hour before grouting.
Grouting Material Preparation
1. When mixing cement-based grouting materials, add water according to the water content specified in the product qualification certificate. Weigh the water first, then pour the grouting material into the water and mix.
2. Before grouting, select (but not limited to) the following equipment and instruments according to the on-site grouting characteristics: mechanical mixing; forced concrete mixer; manual mixing; hand-held drill mixer. The mixing time is 3-5 minutes, and the mixing location should be close to the grouting material location. If there are many bubbles on the surface, let it stand for 3 minutes before pouring, or tap the formwork appropriately.
3. Grouting should be continuous, and the mixed grouting material should be used up within 30 minutes.
4. Vibration is strictly prohibited during grouting. Appropriate tamping can be used, and the formwork can be tapped appropriately at the formwork.
Curing of Grouting Material
1. After grouting, the exposed parts should be sprayed with a curing agent or covered with plastic film, and covered with wet straw bags to keep them moist.
2. When using plastic film coverage, the exposed surface of the grouting material should be covered tightly, and condensation water should be maintained inside the plastic film.
3. If the surface of the grouting material is inconvenient to water, a curing agent can be sprayed.
4. The water curing time should be no less than 7 days, and the number of waterings should keep the grouting material moist.
Precautions
1. According to the weather forecast. Avoid outdoor construction on rainy days. If the working surface is rained on during construction, cover it with a rain cloth immediately. If rainwater enters, rework is required.
2. The standard water content of this product is 0.12-0.14. The water-cement ratio is an important part of cement grouting materials. Arbitrary addition of water will affect the product performance of cement grouting materials.
3. Use special mechanical forced rapid mixing for 3-4 minutes to prevent uneven mixing and the inclusion of unmixed materials, which will affect the later strength of the cement grouting material. Do not use manual mixing with shovels on the ground.
4. Pay attention to temperature changes before construction. Temperature will affect the initial and final setting and fluidity of cement grouting materials. The suitable construction temperature is recommended to be 5-35℃. For low-temperature construction below zero, please inform our company in advance, and we have corresponding high-early-strength and freeze-thaw resistant products.
5. Mechanical vibration is strictly prohibited during construction, but channeling is allowed. Prevent stratification and bleeding of cement grouting materials.
6. The dry density of cement grouting material is 2400KG/m³. According to the cubic meter of the project, the required amount should be calculated, and only the amount needed should be mixed! Do not mix a large amount that cannot be used to avoid waste. The remaining material is strictly prohibited from being remixed into the grouting material for reuse.
7. It is strictly forbidden to add any chemical substances at will to change the product performance of the cement grouting material.
8. This product should be protected from moisture or rain. It can only be reused after passing the quality inspection after the expiration date.
Factory Strength
Qualification
Message
Please provide the following valid information, and we will contact you as soon as possible.